Share

Size
87MWac

322 Hectares

Our Services
Survey

Piling

Tracker & Modules

The Developer

Our Client (EPC)

Beryl Solar Farm

Gulgong, NSW

Tranex Solar announced today it had been awarded the Mechanical contract by Downer (EPC) for the 87MWac Beryl Solar Farm located about five kilometres west of Gulgong, New South Wales.

When in operation, the Beryl Solar Farm will see electricity generated with no water use, no air emissions, and no waste production, with the smallest carbon footprint of any PV technology available. When completed, the 260,000 advanced solar modules on the Beryl Solar Farm will produce energy to run approximately 25,000 average NSW homes, displacing more than 167,000 metric tons of carbon dioxide emissions per year.

Construction is scheduled to take approximately 5 months.

               Need more information ?